Proof in the field.

Real, high-consequence risk decisions — delivered by Auxilium One using the methods Reminatio now brings into one platform.

Open-pit mine terraces.
Tier-1 underground mining company · confidential

Choosing a mining method without betting the mine.

The challenge

The client was weighing several underground mining methods to support future growth — but had no transparent way to compare the non-financial risks. Detailed technical and financial models existed; a structured view of safety, geotechnical, operational and strategic risk did not.

  • ›High capital intensity and long asset life
  • ›Elevated safety and geotechnical exposure
  • ›Irreversible, board-level investment decisions
  • ›Block cave carried seismic risk; sublevel stoping was safer but limited long-term value
The approach

Auxilium One applied a Risk Option Analysis framework that compares strategic alternatives on a relative-risk basis — aligned directly to the client's core objectives of safety and long-term value, and built to be repeatable, auditable and run as a cross-functional workshop.

What we did
  • ✓A custom Risk Option Analysis model with 15+ mining-specific risk variables
  • ✓Agreed weightings separating mandatory from desirable criteria
  • ✓Structured scoring workshops across mining, geotechnical, operations and leadership
  • ✓Automated weighted scoring with a fatal-flaw override to eliminate unacceptable options
The result

The analysis showed a phased strategy — starting with lower-risk Sublevel Open Stoping and transitioning to a high-grade Block Cave — carried the lowest relative risk once safety and long-term value were prioritised. The client adopted the phased approach and moved into detailed studies with strong alignment and materially reduced decision risk.

A winding mine access road through mountains.
Mining operation · 36 km mine access road

Rebuild the 14 km that mattered — not all 36.

The challenge

A 36 km access road built for low-frequency exploration had to carry construction traffic — jumping from ~15 to over 400 loads a month. It crossed steep, forested terrain, had seen multiple community fatalities in five years, and was deteriorating. Yet it was temporary, needed for roughly a year before a permanent road opened.

"How much capital should we spend — and where — on a road we'll use for a year?"

The approach

A risk-led, capital-disciplined strategy that put investment only where it cut the most safety and productivity risk:

  • 1LiDAR survey of the full alignment, flagging gradients over 17% and curve radii under 20 m
  • 2Multidisciplinary field inspection — civil, logistics, maintenance and risk
  • 3A Structured What-If (SWIFT) assessment surfacing 31 areas of concern
  • 4Option analysis to focus engineering on the 14 highest-risk locations
  • 5Bow-tie analysis to control the rest with operational measures
The result

Capital went to the highest-risk sections only, and directly informed the construction tender scope. The upgrade was completed and commissioned six months ago; the road now carries ~300 loads a month with no significant safety or production incidents — safe, reliable access without over-capitalising a temporary asset.

A lone figure at a mountain summit at dawn.
One source of wisdom

The next best decision starts here.

BOOK A DEMO

45 MIN · NO ACCOUNT REQUIRED · YOUR MATERIAL STAYS YOURS

✓

Request received.

We'll come back with two times and one question about the decision you're weighing. Meanwhile, you can open the live demo.

Launch the live demo →
MVP DEMO OPENLaunch demo →